Thank you for taking an interest in part number BEW-5-32PT22D2, a Duff Norton Co Inc product we have in stock that is listed alongside the NSN 3950012839423 and the description “Hoist Wire Rope.” As part number BEW-5-32PT22D2 is readily available for purchase on our website at any time, you are invited to fill out and submit the RFQ form provided on this page for the means of requesting a quote for your comparisons. All that we ask is that you supply us with important information such as your target price and expected shipping time frame so that we can best tailor a solution that caters to your unique needs and restrictions alike.
Note : We Will Not Share Your Information To Any Third Parties.
To ensure that you only procure the exact items you require for carrying out operations, we list all aerospace parts, military and defense parts, and other product offerings with all applicable information for identification. For example, part number BEW-5-32PT22D2 is listed alongside the NSN 3950-01-283-9423, meaning that it also belongs to FSC 3950 Winches Hoists Cranes and Derricks. Furthermore, this NSN part is specifically manufactured under CAGE Code 08722, a unique identifier belonging to the manufacturer for a specific facility. With all of this in mind, kick off purchasing with us today and see why so many customers steadily choose us for their operational needs.
MRC | Criteria | Characteristic |
---|---|---|
ATWP | TRAVEL RATE PER MINUTE | 22.0 FEET |
ACSY | FURNISHED ITEMS AND QUANTITY | 1 AUTOMATIC SAFETY BRAKE AND 1 SAFETY SNAP HOOK AND 1 WIRE ROPE |
AWEJ | TROLLEY SUSPENSION STYLE | PLAIN, STANDARD I BEAM, WHEELS VERTICAL |
AWEK | TROLLEY TYPE | PLAIN |
AWFH | WHEEL CENTER TO CENTER DISTANCE | 5.188 INCHES NOMINAL |
AKPS | DUTY CYCLE | INTERMITTENT |
ATWN | LOAD LIMIT AT SELECTED SPEED AND DRUM LOCATION | 1000.0 POUNDS SINGLE SPEED FIRST DRUM |
ELEC | VOLTAGE IN VOLTS | 115.0 AND 230.0 AND 460.0 |
ATWR | MECHANICAL ADVANTAGE METHOD | MULTIPLE GEAR |
ATWS | BRAKING METHOD | ELECTRIC |
ATWT | HOOK QUANTITY | 1 |
ATWW | LOAD ELEMENT QUANTITY PER HOOK | 1 |
AWEH | SUSPENSION MOUNTING METHOD | TROLLEY |
AGBP | MAXIMUM LIFT HEIGHT | 32.0 FEET |
BBJX | MOUNTING POSITION | PARALLEL |
ADZC | ENVIRONMENTAL PROTECTION | ANY ACCEPTABLE |
BFMF | COOLING METHOD | ANY ACCEPTABLE |
FAAZ | PHASE | SINGLE AND THREE |
AAXH | PRIME MOVER QUANTITY | 1 |
AKNA | INCLOSURE TYPE | FULLY INCLOSED |
ACDC | CURRENT TYPE | AC |
AKDJ | PRIME MOVER TYPE | ELECTRIC MOTOR |
FREQ | FREQUENCY IN HERTZ | 60.0 |
APHE | OPERATION METHOD | POWER |
If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.
Request for Quote